Dissertation
Dissertation > Transportation > Road transport > Bridges and Culverts > Bridge Construction > Bridge maintenance, repair and remediation

The Abutment Jump Analysis and Prevention

Author LiMingJie
Tutor ChenZhongDa
School Chang'an University
Course Road and Railway Engineering
Keywords Highway Asphalt Pavement Foundation Abutment Bridgehead Bump Uneven settlement Comprehensive prevention and control
CLC U445.7
Type Master's thesis
Year 2004
Downloads 478
Quotes 19
Download Dissertation

Bridgehead Bump structures Abutment uneven subsidence caused by the expressway to the one of the \Less paper combines ( temple ) Rockwell ( yang ) highway project Abutment Treatment , access to a large number of domestic and international literature on the basis of the analysis of the dangers of Bump ; by Bridgehead investigation , analysis of the bridge jump the reason of the car , while the longitudinal slope change , dislocation and depression , cross slope change is uneven settlement of the three forms ; analysis Bump mechanism in the form of differential settlement ; deformation of foundation settlement and embankment itself deformation compression Abutment settlement two constituent part composed of two parts , both deformation settlement calculation method is derived to explore the degree of compaction , filling height and the relationship of the settlement ; comfort and safety of the principle , proposed the uneven subsidence control standards . On this basis , from the foundation Treatment abutment back embankment Pavement Treatment and drainage measures studied Bump Integrated Control Technology Replacement Method , compaction, cement and fly ash gravel pile and drainage solid knot Ground Treatment method ; the geogrid , dynamic compaction method and two gray mixture backfilling Abutment Treatment method ; setting bridgehead tray and transitional road abutment back pavement Treatment methods; , and back drainage improvement measures .

Related Dissertations
More Dissertations