Dissertation
Dissertation > Industrial Technology > Building Science > Construction > The project and the type of work > Foundation engineering > Pile, piling works

Job quality control of the construction site of the Bored

Author HuangZhiHe
Tutor YeQing;LiuBenYuan
School Huaqiao University
Course Architecture and Civil Engineering
Keywords Bored Quality Control Field operating system Pile Foundation Quality Inspection
CLC TU753.3
Type Master's thesis
Year 2011
Downloads 35
Quotes 0
Download Dissertation

As of engineering construction and the real estate market is booming , a large number of high-rise buildings , bridges , ports and other projects pile foundation. Has many advantages , Bored of concrete is one of the foundation in the form of common in the high-rise building pile foundation . Due to the uneven quality of the construction unit , ineffective means of control , causing instability in the level of quality , not only affect the quality of the project and duration , also caused investment Breakthrough phenomenon , a huge loss to the country , the people's property . In this paper, using a combination of theoretical analysis and empirical analysis study . The first theory of on-site quality control of the operating system is based on analysis of the quality of construction projects and its related factors , the study engineering quality control process and principles , as well as the scene operating system of quality control process , the basis of procedures , methods and means . Then combined with the one I Quanzhou Donghai Ben Thanh , the construction of K project Bored , Bored construction technology, methods and their quality control analysis , summarizes the common quality of the accident , identify quality control ways , the quality of the analysis of the accident , to study the appropriate countermeasures , thus ensuring the quality of Pile Foundation Construction , reduce the quality of the accident . While theoretical exploration is more important to explore the specific application of the theory , and learn about the construction site of the operating system of quality control theory to solve the problem of how quality control of the construction site of the operating system , and the construction Bored to accumulate experience , summed up the way . Pile Foundation Construction of the project quality control to achieve better results through the pile quality testing data description , to achieve the expected quality control objectives .

Related Dissertations
More Dissertations