Designing & Implementing on Cost System of Water Project

Author LiuChengGang
Tutor PanWuMing;GuoShaoKang
School Sichuan University
Course Software Engineering
Keywords Water conservancy project construction cost Data stratified computing Open fee schedule Custom reports
CLC TP311.52
Type Master's thesis
Year 2005
Downloads 208
Quotes 0
Download Dissertation

With the transformation of China's economic system and the gradual establishment of the market economy system , has become a topic of common concern of management decision-makers find the best combination of points between the investment and the income of the water conservancy project , the systematic management of water conservancy project construction cost . The Water Projects need experienced project decision-making , design , construction , and completion and acceptance stages . Calculate the project cost are a key link in the design phase , it directly affects the water conservancy investment and efficiency . Accurate project cost is both important basis for selected engineering design , is the basis for management decision-making . Therefore , the water conservancy project cost system came into being . Currently on the market have been several water engineering cost system . Various water conservancy project construction cost system with this or that problem , the most important focus is reflected in several aspects : the versatility of the system , the project costs were not calculated in real time or slow calculation , the setting of the fee schedule is not flexible and print a report not flexible . In -depth understanding of the water conservancy project construction cost business , on the basis of a detailed analysis of existing water conservancy in the current domestic quota system and hydraulic engineering cost development method , this article attempts to fundamentally solve the above problems . The system uses a different quota system corresponds to a different database to solve the general problem of the cost of the system ; data linear calculation and the data stratified calculate the real-time data to solve computational problems ; using \resolve fee schedule flexibility ; \In addition to solve the above problems , the paper at the same time on the core business of the water conservancy project construction cost detailed discussion of the analysis , put forward their own solutions . This paper analyzes the demand for water conservancy project construction cost , and according to the needs of the design and implementation . The system uses the face object design , prototype -driven development model to carry out project activities to ensure high scalability, security and flexibility of the system .